A couple of weeks ago, we received a letter from our right of way agent announcing that he’s moving on to another job close to his home in Minnesota. As strange as it seems to say it, we’re actually sorry to see him go. The truth is that during the construction phase of the project, he was very responsive to us– far more so, from what we’ve heard from many other landowners, than most other land agents. We’ve been sort of lucky in this regard.
In fact, this week we learned just how true that it. Our agent left us with a couple of new land agent contacts for the restoration phase. We called one of them to check on the status of restoration and because we wanted to ensure that our topsoil situation would be handled properly. The agent was not responsive. He seemed annoyed by the call, didn’t have any information for us regarding when we could expect restoration to begin on our property, and was disinclined to even bother looking into our situation. So you can imagine our surprise when, the very next day, crews arrived to begin restoring our property.
So we called him again. Same response: he just wasn’t interested. He didn’t even want to come out and talk with us as we asked. Frankly, he was so unhelpful and apparently annoyed that we were even calling him, that we’re tempted to do something we’ve never done before and name him by name. But we won’t. (However, if you’re on phase one and you want to know who NEVER to call, send me a note and I’ll tell you who to avoid.)
The good news is that the supervisor of the restoration crew and the environmental inspector were both VERY helpful. We had satisfying conversations with both about the items on our line list and what we wanted to happen with restoration. And they appear to have made sure all of those things happened. As always, we took some photos:
The crew– here’s more good news: almost all of them, they told us, are from Michigan– worked remarkably fast. First, they moved our pile of timber (which they were supposed to have moved when the took the trees down).
Then they decompacted the subsoil (or so the environmental inspector said; we’re a little nervous about this).
Then they brought in the new topsoil, as agreed to after they spoiled our original topsoil by mixing it with heavy subsoil.
Then– but only because I asked about it– they moved the big pile of wood chips we wanted saved. These chips were supposed to be hauled away when construction started. But since they didn’t take them away, we thought we’d keep them for mulch. Our line list said to move them to the back of the property, but the crew apparently didn’t know that (more on this in a minute).
But finally, they were placed in the right spot– it’s a much bigger pile than we thought!
We did get a couple of nice surprises. This daisy was on the edge of the temporary workspace– and survived.
Even better, buried underneath that pile of shredded wood were these bearded irises, white for lack of sunlight for months, but still alive. True survivors!
Crews aren’t quite finished yet, though things look a lot better now– no more orange fence! And we are (mostly) satisfied with this phase of restoration. Yet lots of questions marks about re-vegetaation remain. And there are some important lessons for those of you yet to go through this, whether you are on phase one or on phase two. For instance,
- Be sure you touch base with your land agent before restoration begins on your property. Reiterate the items on your line list and mention any new concerns or instructions you might have.
- The only downside to doing that, unfortunately, is that not all right of way agents are reliable or effective communicators. So no matter what you say, it might not make it to the construction crews. Therefore, if at all possible, try and find the restoration crew supervisor before they begin. Repeat your concerns to him.
- Similarly, if you can find the environmental inspector– there should be one on your property at some point– seek her or him out and discuss any concerns.
- We are fortunate to have the kinds of work schedules that allow us to be here to see what’s happening most of the time. We’re sure that’s not true for everyone. So this next piece of advice will be more difficult for some of you. Nevertheless, as best you can, BE VIGILANT. Check on what’s happening on your property. Watch when you can. As much as you are able, be your own inspector. The crews are generally good people (in our experience) and respectful. But communication from land agents isn’t always what it should be, so they might make unwitting mistakes. Watch for them.
- Lastly, if you are on phase two and won’t experience restoration for a very long time, it’s not too early for you to be thinking about these things also– even if you don’t yet have an agreement with Enbridge. Think about what you want to happen on your property once the project is completed. Think about what is unique about your property and important to you and what measures should be taken to ensure that those concerns or unique features are appropriately addressed– then have those things put into your line list. If phase two readers would like it, we’d be happy to work up a separate post on the kinds of things one might have put on a construction line list.
In the meantime, we’ll continue to report on restoration matters as they progress. Please let us know what’s happening– good or bad– on your property as “clean up” continues.